Open Access Open Access  Restricted Access Subscription Access

Evaluations of Sampling Inspection with minimum cost in Continuous type of Production

Nirmala V, Suresh. K. K

Abstract


Abstract

The main objectives of this paper are optimum designing of Continuous Sampling Plan in Continuous type of production indexed through Maximum Allowable Average Outgoing Quality (MAAOQ) for final products. Selection of the Sampling Plan is CSP-M. Operating Characteristic function and MAAOQ function are derived; Tables, figures and its parameters are derived in this work. It is a preferred quality index for quality engineers.


Full Text:

PDF

References


References

ANSCOMBE. F.J.,(1958): Rectifying inspection of a continuous output, journal of the American Statistical Association, Vol. 53, No.283, pp. 702-719.

BALAMURALI.S. and CHI-hyuckjun, (2004): Modified CSP-T sampling procedure for continuous production process, Quality technology and quantitative management, Vol.1, No.2, pp.175-188.

BALAMURALI.S., KALYANASUNDARAM, M., AND CHI-HYUCK JUN, (2005):Generalized CSP-(c1-c2) sampling plan for continuous production processes, International Journal of Reliability, Quality and Safety Engineering, Vol.12, No.2, pp.75-93.

CHUNG-HO CHEN,(2004): Minimum Average Fraction inspected for Modified Tightened Two-level continuous sampling plans, Tamkang Journal of Science and Engineering, Vol.7, No.1, pp.37-40.

CHUNG-HO CHEN, (2005): Average Outgoing Quality Limit for Short-Run CSP-1 plan, Tamkanf Journal of Science and Engineering, Vol.8, No.1, pp.81-85.

CHUNG-HO CHEN, and MIN-TSAI LAI, (2006): Minimum Average Fraction inspected for CSP-M Plan, Tamkang Journal of Science and Engineering Vol.9, No.2, pp. 151-154.

CHUNG-HO CHEN, and CHAO-YU CHOU, (2006): Economic Design of Short-Run CSP-1 Plan under Linear Inspection Cost, Tamkang Journal of Science and Engineering Vol.9, No. 1, pp.19-23.

GAURI SHANKAR, and MOHAPATRA, B,N., (1994): GERT analysis of Dodge’s CSP-1 continuous sampling plan, The Indian Journal of Statistics, Vol.56, No.3, pp.468-478.

GHOSH, D.T., (Series B 1960-2002), The continuous sampling plan that minimises the amount of inspection. The Indian Journal of Statistics, Vol.50, No.3, pp.412-427.

GOVINDARAJU, K.( 1989): Procedures and Tables for the selection of CSP-1 plans, Journal of Quality Technology, Vol.21, No.1, pp.46-50

MUTHULAKSHMI, S. (2012): Stopping rules to limit inspection effort in CSP-C continuous sampling plan, International Journal o f Mathematical Archieve, Vol.3, No.2, pp.656-662.

NIRMALA.V (2005): Certain study on special purpose plans involving weighted risk, M.Phil. Dissertation, Department of Statistics, Bharathiar University, Coimbatore, Tamil Nadu, India.

NIRMALA.V and SURESH. K. K. (2017): Construction and Selection of Continuous Sampling Plan of type (CSP-T) Indexed through Maximum Allowable Average Outgoing Quality, Journal of Statistics and Management System, Vol. 20, No. 3, pp. 441-457.

NIRMALA.V and SURESH. K. K. (2017): Designing of Continuous Sampling Plan of type (CSP-3) indexed through Maximum Allowable Average Outgoing Quality with Markov chain approach, International Journal of Statistics and Systems, Vol. 12, No. 2, pp. 277-283.

NIRMALA.V and SURESH. K. K. (2017): Designing of MATLAB Program for Various Fuzzy Quality Regions in CSP-MLP-T-3 Sampling plan, International Journal on Future Revolution in Computer Science and Communication Engineering, Vol. 3, No. 7, pp. 065-068.

SURESH, K.K and RAMKUMAR, T.B (1996): Selection of sampling Plans indexed with Maximum Allowable Average Outgoing Quality (MAAOQ), Journal of Applied Statistics, Vol.23, No.6, pp. 645-654.

NIRMALA.V and SURESH. K. K. (2018): Optimum Designing of Bayesian Conditional Repetitive Group Sampling Plan indexed through Quality Regions, Journal of Statistics and Mathematical Engineering, Vol: 04, Issue: 02, pp. 01 - 09.


Refbacks

  • There are currently no refbacks.