Open Access Open Access  Restricted Access Subscription Access

The difference among the local postage stamp technique and the newPOC(point of connection) charging approach method

Basher Ahmed, Rashed khan, DR. Mohammad s. Miah

Abstract


This paper summarizes the difference among the regional postage stamp technique and the new poc(factor of connection) charging approach used for fee allocation for the transmission device in accordance to the utilization. Troubles related with the modeling of HVDC traces are also mentioned. Comparison and analysis has been completed on the Indian gadget and the end result indicates good sized variations inside the prices.


Full Text:

PDF

References


An advent to the pricing of electrical energy transmission, Utilities policies, extent 6, trouble three, September 1997 by using Michael Hsu.

Sharing of Interstate transmission fees and losses CERC guidelines.

The importance of Marginal Loss Pricing in an RTO surroundings, Leslie Liu, Tabors Caramanis,Cambridge power answers.

AssefZobian, Richard D. Christie, Bruce F. Wollenberg and IvarWangensteen, “Transmission control inside the Deregulated environment”, court cases of the IEEE, volume 88, No. 2, pp. 170, 2000

short Profile of power grid and its place of information, www.powergridindia.com.

D. Shirmohammadi, X.V. Filho, B. Gorestin, and M.V.P. Pereira, “a few essential Technical ideas about value based Transmission Pricing,” IEEE Trans. on strength structures, vol. eleven, no. 2, pp. 1002-1008, may 1996.

T. W. Gedra, “On transmission congestion and pricing,” IEEE. Trans. energy Syst., vol. 14, pp. 241–248, Feb. 1999.


Refbacks

  • There are currently no refbacks.