PLANNING AND SCHEDULING RESIDENTIAL BUILDING USING PRIMAVERA SOFTWARE

K. Suresh Kannan, M. G. Ranjith Kumar

Abstract


Planning, scheduling and controlling is more important in the projects. This specialization requires more focused project planning and controlling techniques that prove to be better for certain types of projects. Planning leads to improved performance in terms of cost, schedule and operations, balancing the competing needs of a project. Planning is used to tracking of work and cost control of the project. This project mainly doing for residential building using primavera p6 software. This paper tries to explain about the two storey residential building planning, scheduling using the primavera p6 software.

Full Text:

PDF

References


Ankur, Verma, K.K. Pathak and R. K. D, “Planning scheduling of a construction project using primavera software”. Volume -6, Issue IV (October – December 2013). Paper -3.

S. Birgulkutlu, “Project management software selection using Analytic Hierarchy process method” Volume 4 ISSN: 1273-1567, (2014).

A.K.Gupta, D.B.Desai “A Project management approach using Erp and Primavera in construction industry” Volume 3, ISSN: 2278-1684, PP: 21-24, (2014).

T.Subramani, A.Sarkunam, “Planning and scheduling of High Rise Building using Primavera software”. Volume 4, (Version 5), PP134 – 144, (2014).

B.S.K Reddy, S.K. Nagaraju, M.D. Salman, “A Study on optimization of resources for multiple projects by using primavera”. Volume 10, No 2 (2015) 235-248. (February 2015).

Nisarg M Mistry, Mayank A Kanani, “Application of primavera software for scheduling of row house to complete project on time”. Volume 6, October 2014.

Unmesh .Y. Pole Kari “Planning, scheduling and tracking of a residential project using primavera software” department civil engineering, Maharashtra institute of technology”. Vol. 3, Issues 5, ISSN: 2321- 7782, (May 2015).

T.Subramani, K.Chinnadurai, “Construction management and scheduling of residential building using primavera software”. Volume 4, Issue 5, (May 2015).

Raj saran, Neel Fondekar, “Planning and Scheduling of Two Storey Residential Building Using Primavera P6”. Volume 3, Issue: 4, (December 2016).

P.Raghul Reddy, B.Harish Naik, “Planning and scheduling of residential (G+7) Project using Primavera”. Volume 5, Issue: 10, (October 2016).

S M Abdul Mannan Hussain, Madamachi Mani Chakravarthy, “Scheduling of a residential building using project management techniques”. Volume 3, Issue: 5, (March 2017).

Mohd Ilyas Ahmed, Brijbhushan S, Maneeth P.D, (August 2017) “planning, scheduling, resource allocation and tracking of residential (G+2) Villa using Primavera software”. Volume 4, Issue: 8, (August 2017).

Vipin Kumar, Dr.Shreenivasareddy Shahpur, “Analysis of academic building by Planning, scheduling and resource allocation using oracle primavera P6”. Volume 3, Issue: 6, (December 2017).