Preparation of Resource Allocation Spreadsheet of a Building Project Using Microsoft Project for Small Contractors

Mr Dev Acharya, Mr Kaushik Majumdar, Mr Mayank Gupta

Abstract


Project management is a process that includes arranging, putting the task design vigorously and estimating advancement and arranging. It includes distinguishing the task prerequisites, setting up venture targets, adjusting requirements, and taking the necessities and desires for the key partners into thought. In usage, the administration of these two frameworks is frequently very unmistakable, and in that capacity requires the advancement of unique specialized aptitudes and administration techniques. It has dependably been honed calmly, yet started to develop as a prime calling in the mid-twentieth century. In this project work we will perform a scheduling a building project and prepare a sheet of resource allocation in M.S. excel for small contractors.

Full Text:

PDF

References


Prof. A. Ray Chaudhuri, B. Sivakonda Reddy, Prof. A. Ray Chaudhuri, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2012 PN (660 – 665)

Indrasen Singh, P. Venkateswaralu, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102)

Antony Prasanath MA, Thirumalai Raja K, “Analysis of cost & schedule Performance of Residential Building Projects by EVM technique”, Journal of Construction Engineering, Technology and Management ISSN: 2347- 7253, Vol. 4, (2014) PN (1-7)

Tarek Hegazy, Wail Menesi, “Critical Path Segments Scheduling Technique” Journal of Construction Engineering and Management ASCE/ (Oct 2010) PN (1078-1085)

Awad Hanna, Aviad Shapira, Mounir Asmar and Craig Taylor, “Impact of crew scheduling on project performance”, Practice Periodical on Structural Design and Construction ASCE (2013) PN (35 – 44)

Robert B. Harris, “Packing method for Resource Levelling”, Journal of Construction Engineering and Management © ASCE, vol no 116, June 1990 PN (331 – 350)

Khaled El-Rayes and Dho Heon – “Optimizing Resource Leveling in Construction Projects”, Journal of Construction Engineering and Management © ASCE, Vol. 135, No. 11, November 1, 2009. PN (1172 - 1180)

James E. Seibert and Gerald W. Evans, “TimeConstrained Resource Leveling”, Journal of Construction Engineering and Management, ASCE Vol. 117, No. 3, September, 1991. PN (503 – 520) [9] O. Shaked and A. Warszawski, “Conshed : Expert System for Scheduling of Modular Construction Projects”, Journal of Construction Engineering and

Management, ASCE/ vol 118, Sept. 1992 PN (488 – 506)

Piotr Jaskowski and Anna Sobotka, “Scheduling Construction Projects Using Evolutionary Algorithm”, Journal of Construction Engineering and Management, ASCE/ Aug 2006 PN (861 – 870) [11]Daniel Castro-Lacouture, Gürsel A. Süer Julian Gonzalez-Joaqui; and J. K. Yates, “ Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method” ASCE , ISSN 0733-9364/2009/10-PN (1096– 1104)

A. Kastor a, K. Sirakoulis, “The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem”, Science Direct International Journal of Project Management 27 (2009) PN 493–500


Refbacks

  • There are currently no refbacks.