Preparation of Resource Allocation Spreadsheet of a Building Project Using Microsoft Project for Small Contractors
Abstract
Full Text:
PDFReferences
Prof. A. Ray Chaudhuri, B. Sivakonda Reddy, Prof. A. Ray Chaudhuri, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2012 PN (660 – 665)
Indrasen Singh, P. Venkateswaralu, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102)
Antony Prasanath MA, Thirumalai Raja K, “Analysis of cost & schedule Performance of Residential Building Projects by EVM technique”, Journal of Construction Engineering, Technology and Management ISSN: 2347- 7253, Vol. 4, (2014) PN (1-7)
Tarek Hegazy, Wail Menesi, “Critical Path Segments Scheduling Technique” Journal of Construction Engineering and Management ASCE/ (Oct 2010) PN (1078-1085)
Awad Hanna, Aviad Shapira, Mounir Asmar and Craig Taylor, “Impact of crew scheduling on project performance”, Practice Periodical on Structural Design and Construction ASCE (2013) PN (35 – 44)
Robert B. Harris, “Packing method for Resource Levelling”, Journal of Construction Engineering and Management © ASCE, vol no 116, June 1990 PN (331 – 350)
Khaled El-Rayes and Dho Heon – “Optimizing Resource Leveling in Construction Projects”, Journal of Construction Engineering and Management © ASCE, Vol. 135, No. 11, November 1, 2009. PN (1172 - 1180)
James E. Seibert and Gerald W. Evans, “TimeConstrained Resource Leveling”, Journal of Construction Engineering and Management, ASCE Vol. 117, No. 3, September, 1991. PN (503 – 520) [9] O. Shaked and A. Warszawski, “Conshed : Expert System for Scheduling of Modular Construction Projects”, Journal of Construction Engineering and
Management, ASCE/ vol 118, Sept. 1992 PN (488 – 506)
Piotr Jaskowski and Anna Sobotka, “Scheduling Construction Projects Using Evolutionary Algorithm”, Journal of Construction Engineering and Management, ASCE/ Aug 2006 PN (861 – 870) [11]Daniel Castro-Lacouture, Gürsel A. Süer Julian Gonzalez-Joaqui; and J. K. Yates, “ Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method” ASCE , ISSN 0733-9364/2009/10-PN (1096– 1104)
A. Kastor a, K. Sirakoulis, “The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem”, Science Direct International Journal of Project Management 27 (2009) PN 493–500
Refbacks
- There are currently no refbacks.