Planning, Scheduling, Resource Allocation & Risk Analysis of an Industrial Project using Primavera P6
Abstract
In this study, I am comparing a working project with a previously completed project of same aspect, for this research work we have chosen Nahar Industry new block, mandideep, Bhopal. Which is on the verge of execution. For planning, scheduling and resource allocation we are using project management tool Primavera P6 8.3. From the examination, it is discovered, how the task is arranged, the succession of work and connecting connections between exercises for the entire venture. In end it is comprehended that, it is vital to understand that there will be changes to the calendar rationale and also contrasts between the arranged advancement and real advancement. In light of the distinctions the calendar
should be changed in order to finish the venture easily.
Full Text:
PDFReferences
Piyush Pramod Bagade and Prof. Abhijit Bhirud, “Review on construction project management software primavera p6” international journal of engineering sciences & research technology, ISSN: 2277-9655, January, 2018, PN (110-117).
Poonam Raykar and Ghadge A. N., “Analyzing the Critical Factors Influencing the Time Overrun and Cost Overrun in Construction Project” International Journal of Engineering Research, Volume No.5, ISSN: 2319-6890, 9 Jan 2016, PN (21-25).
A. Ray Chaudhuri, B. Sivakonda Reddy and S. K. Nimbal, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2017 PN (660 – 665)
A. R. Nikumbh and S. S. Pimpliker, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102).
P M Wale1 , N D. Jain , N R Godhani , S R Beniwal and A A Mir, «Planning and Scheduling of Project using Microsoft Project (Case Study of a building in India», IOSR Journal of Mechanical and Civil Engineering, ISSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PN 57-63.
Shaik Mohammad, Kunal B. Badgujar, B.A.Konnur and Amarsinh B. Landage “A Review of EVM Analysis with Primavera”; International Journal of Engineering Research ISSN:2319 6890(online),2347-5013 Volume No.5,
Issue Special 1 9 Jan 2014 PN: 164-167
Hamid, R. Gupta, Parag S. Mahatme and Taran C. Bhagat “The cost controlling and monitoring of Construction project through earned Value management system” International Journal of Advanced Technology in Engineering and Science www.ijates.com Volume No 03, Special Issue No. 01, March 2013 ISSN (online): 2348 – 7550
P. Dayakar and M. Udhayakumar, «Study on Project Management of an Ongoing Construction project Using MSP Sub Structure” Volume2 Issue 5 Number2–Oct 2012, PN 202-212.
Stephenson, P. and Fapohunda, J. A. “Optimal Construction Resources Utilization: Reflections of Site Managers’ Attributes. The Pacific Journal of Science and Technology, Vol. 11. No. 2. November 2010 (Fall) PN 105-109.
Tranner, D. S. Stephan Jabasingh and J. Jayalakshmi “Analysis of Cost Controlling In Construction Industries by Earned Value Method Using Primavera”; Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 6( Version 1), June 2009, PN.145-153.
Refbacks
- There are currently no refbacks.