A Review of Precast, Pre-stressed Concrete Panel Bridge Deck System and a Proposed New Model for Bangladesh
Abstract
Precast pre-stressed concrete panels (PCP) to act as stay-in-place (SIP) deck forms were introduced in the early 1950s by the Illinois Department of Transportation (DOT) as an alternative and economic bridge system. Many countries around the world have successfully implemented the system since then. Traditionally, cast in place concrete has been the primary method for bridge deck construction in all over the world. This method requires large amount time, labor and causes delays in various forms. Moreover, quality control is very difficult. On the other hand, PCP system gives higher quality control, speedy construction, economy and other benefits. This article gives a review of the PCP system worldwide and its potential application with a proposed new PCP bridge deck model.
Full Text:
PDFReferences
USA Report card, by American Society of Civil Engineers (ASCE), 2017, https://www.infrastructurereportcard.org/
Barker, J. M. (1975) Research, Application, and Experience with Precast Pre-stressed Bridge Deck Panels,” PCI Journal, Vol. 20, No.6, pp. 66-85.
Bender, M. E.(1957) Pre-stressed Concrete Bridges for the Illinois Toll Highway, Proceedings World conference on Pre-stressed Concrete, San Francisco, California, pp. A11-1- 8.
Moore, M.E., J. Wang, P. Albrecht, C. Gilstrap, (1991) “Model Bridge Study Volume V: Evaluation of Precast Deck Panels,” Federal Highway Administration, VA, August 1991.
Tadros, Maher K. Ph.D., P.E.; Hanna, Kromel E; and Morcous, George Ph.D., "SECOND GENERATION PRECAST DECK PANEL (NUDECK) SYSTEM" (2010). Final Reports & Technical Briefs from Mid-America Transportation Center 49
PCI Bridge Committee (1987), Precast Pre-stressed Concrete Bridge Deck Panels,” PCI Journal, Vol.32, No.2, pp. 26-45.
Latifee E.R., Cook R., (2003) Precast Pre-stressed Concrete Panels as Stay In Place Bridge Deck Form, Master’s Project, University of New Hampshire, USA.
American Association of State Highway and Transportation Officials AASHTO, (2005) “Prefabricated Bridge Elements and Systems in Japan and Europe”, 2005, Report No. FHWA-PL-05-003.
Oliva MG, Bae HU, Bank LC, et al (2007) Design and construction of a reinforcement free concrete bridge deck on precast bulb tee bridges. Concrete bridge conference
Hanna KE, Morcous G, Tadros MK (2010) Rapid construction of pacific street bridge. SPR-PL-1 (037) P587, p 158
Brach AM (2003) interim planning for a future strategic highway research program—a summary report. NCHRP Report 510. Transp Res Board, Washington DC
Freeby GA (2005) Texas’s totally prefabricated bridge superstructures. Transp Res Record: J Transp Research Board, CD 11-S. Transportation Research Board of the National Academies, Washington DC, p 169–174
Hanna KE, Morcous G, Tadros MK (2008) Standardized precast pre-stressed concrete panels for bridge decks, CBC
Personal contact, RHD (2016) Office of the Executive Engineer, Roads & Highways Department, Sarak Bhaban, Tejgaon, Dhaka.
Refbacks
- There are currently no refbacks.